Change-order handling and the job site
AIMZ and Dalux
Changes that arise on the job site are registered where they happen – in Dalux. AIMZ fetches them with description, attachments and status, and adds an amount and a deadline. That way the change is both documented on site and counted in the forecast.
How it works
From a case in Dalux to a claim in the forecast
The job site keeps working in Dalux as before. AIMZ adds the financial layer on top, so a case documented on site also gets an amount, a deadline and a status in change-order handling.
- 1
Connect the project
The Dalux project is connected to the project in AIMZ with read-only access. Access can be revoked at any time.
- 2
Choose what counts as economy
You decide which case types in Dalux should become change orders in AIMZ. Everything else stays where it is.
- 3
Set the amount and deadline
The case arrives with a description and reference. In AIMZ it gets an amount, a notice deadline and a status – and hits the forecast.
What syncs
The documentation stays in Dalux
Data flows one way: from Dalux to AIMZ. Photos, drawings and case history stay where they belong, and AIMZ references the case instead of copying it.
- Change and non-conformance cases with description and status
- A reference back to the case, photos and drawing in Dalux
- Registration date as the basis for the notice deadline
- Responsible party and trade, so the case lands on the right cost item
Setup
- Direction
- Dalux → AIMZ
- Access
- Read-only
- Update frequency
- Continuously through the day
- Level
- Per project
About Dalux
The job-site tool many Norwegian projects already use
Dalux is a Nordic platform for job-site and project documentation, with drawings, BIM models, non-conformances, checklists and tasks – used widely by builders, contractors and consultants. The cases registered out in Dalux are often the same ones that later become a change claim, and that's exactly where AIMZ connects.
Read more at dalux.comFrequently asked questions
Do we have to stop using Dalux?
No, quite the opposite. The job site keeps working in Dalux, and it's the point that the documentation stays there. AIMZ fetches the case and adds the financial layer – amount, deadline and effect on the result.
Do all non-conformances in Dalux become change claims?
No. You choose which case types carry over. A defect that should be remedied within the contract is not a change claim, and shouldn't be treated as one.
What about photos and drawings?
They aren't copied. AIMZ references the case in Dalux, so the documentation has one location and one version. That's also what holds up in a dispute or a final settlement.
Why does the registration date matter?
Because the notice deadlines in NS 8405 and NS 8407 run from when the matter was discovered. When the date comes from Dalux, it's documented on site and not set after the fact.